Our work begins early in the project lifecycle. We support clients with concept development, grid studies, and permitting to define optimal solutions for performance and regulatory compliance, including alignment with requirements introduced under VJV 2024 and SJV 2024. From there, we take full responsibility for design, procurement, construction, and commissioning — ensuring every system integrates seamlessly into the existing grid or renewable asset.
02
What we deliver
- Grid connection planning and the connection process with Fingrid or the local grid owner.
- 110 kV and 33 kV substations, main transformers and switchgear.
- MV collection network, cabling and earthing.
- Civil works: foundations, roads, cable routes, fencing and drainage.
- Integration of battery containers, PCS and the EMS with the substation and SCADA.
- Commissioning, grid code compliance testing and handover documentation.
- Operations & maintenance after handover